How to Install a Solar System at Your Home — Step-by-Step Guide
A simple step-by-step guide to installing a solar system at home—from consumption analysis to design, installation, subsidy, and net metering.
🌞 How to Install a Solar System at Your Home — Step-by-Step Guide
Introduction
Installing solar at home can feel complex — panels, inverters, wiring, subsidies, net metering — but when broken into clear steps, the process becomes simple and predictable.
This guide walks you through each stage so you know exactly what to expect before going solar in India.
✅ Step 1: Analyse Your Electricity Consumption
Check your past 12 months’ electricity bills.
Note the following:
Monthly units (kWh)
Highest month (peak consumption)
Connected load
Common rule:
100 units/month ≈ 1 kW solar system.
✅ Step 2: Decide Your Solar Capacity
Based on consumption:
150–200 units/month → 2 kW
250–300 units/month → 3 kW
350–400 units/month → 4 kW
450–500 units/month → 5 kW
Your solar installer will confirm the exact size.
✅ Step 3: Choose the System Type
There are three major types:
1. Grid-Tied System
No batteries
Maximum savings
Works with net metering
Best for: Homes with stable grid supply
2. Hybrid System
Solar + Grid + Battery
Power at night + outage backup
Best for: Homes needing 24×7 stable power
3. Off-Grid System
Battery-dependent
No grid needed
Best for: Remote or low-grid areas
✅ Step 4: Roof Inspection & Site Survey
A technician will check:
Roof direction & slope
Shading (trees, buildings, water tanks)
Available area
Structural strength
Distance to electrical panel
Minimum space required:
1 kW ≈ 80–100 sq ft
✅ Step 5: System Design & Quotation
The solar company prepares:
Panel layout
Inverter selection
DC/AC wiring plan
Safety components
Savings & ROI estimate
Review:
Warranty on panels (25 years)
Warranty on inverter (5–10 years)
Brand quality (Tier-1 recommended)
✅ Step 6: Apply for Subsidy (If Applicable)
For residential customers under PM Surya Ghar Yojana:
Register on the national portal
Choose empaneled vendor
Upload documents
Inspection → approval → subsidy disbursement
This step is usually assisted by your installer.
✅ Step 7: Installation & Commissioning
Installation is completed in 1–3 days.
Work includes:
Mounting structure installation
Panel fixing
Inverter setup
DC/AC wiring
Earthing & lightning protection
Testing & commissioning
✅ Step 8: Net Metering Approval
Your DISCOM installs:
Net meter
Bidirectional meter
This allows exporting extra power to the grid.
Processing time varies by state (1–6 weeks).
✅ Step 9: Monitoring Setup
Your inverter app shows:
Daily generation
Monthly savings
System health
Alerts & faults
This helps ensure peak performance.
✅ Step 10: Maintenance (Very Minimal)
Solar systems need low upkeep:
Clean panels every 15–30 days
Check wiring yearly
Monitor performance through app
That’s it — solar runs smoothly for 25+ years.
🌍 Final Thoughts
Installing a solar system at home is one of the smartest financial and environmental decisions you can make. With the right planning and the right installer, the process is simple, efficient, and highly rewarding.
🔗 Stay Connected with Swan Solar Services
Website: https://www.energyswan.in
Facebook: https://www.facebook.com/SWANSolarServices
Instagram: https://www.instagram.com/swansolarservices
YouTube: https://www.youtube.com/channel/UC6aRMqjbW81ru0ky1ZXarrw
LinkedIn: https://www.linkedin.com/in/swan-solar-services-209534243
☀️ Need help with solar installation or subsidy guidance?
सोलर इंस्टॉलेशन या सब्सिडी से संबंधित सहायता चाहिए?
📞 +91 95225 57717
Lastest blog posts
Achieve Your Business Goals
with Alexander Consulting!
Explore a dynamic user experience design project infused with financial management, investments, and profit-driven strategies. Dive into our elegantly crafted website, designed to empower users to invest intelligently with AI assistance.
87 %
reduction in hiring costs
Nolan Vaccaro
Director, Continental
91 %
Retention rate
Justin Rhiel Madsen
Design director, 3Lateral